+
  • 5(1775530758791).jpg

Double-End Nipple

Type:Made by seamless steel pipeMade by welded steel pipe Finishing:Black, Hot-dipped Galvanized, Electric Galvanized

Keywords:

NIPPLE & SOCKET

Classification:

ProductDetail

Product Parameters

Type Made by seamless steel pipeMade by welded steel pipe
Finishing Black, Hot-dipped Galvanized, Electric Galvanized
American Standard ASTM A733
Pipe standard: ASTM A53
Thread: ANSI B1.20.1
DIN Standard DIN2982
Pipe: DIN2440
Thread: DIN2999
British Standard BS EN10241
Pipe: BS1387
Thread: BS21
Size 1/8″ – 6″

About Yaokai

Cangzhou Yaokai Pipe Fitting Manufacturing Co., Ltd. covers an area of 30000 square meters and is equipped with advanced production lines and testing instruments. Yaokai has now become one of the largest flange and pipeline manufacturers in Hebei Province. China has an annual production capacity of 14000 tons. Its main production equipment includes forging hammers, rolling ring machines, lathes, drilling machines, punching machines, punching machines, shot blasting machines, etc., used to produce flanges, elbows, tees, reducers, and covers of different size ranges. The available materials include carbon steel, stainless steel, and alloy steel. Yaokai has a group of experienced engineers and technical professionals with strong technical strength. The product is manufactured in accordance with international standards such as ANSI, DIN, EN1092, JIS, BS, GOST, or customer specific requirements and designs. 

Our advantages

Manufacturer supply


The company was founded in 2016 and has over ten years of experience in manufacturing and producing pipe fittings.

OEM


Has its own R & D and design team, can be customized to map samples, excellent material selection, quality assurance.

Global Services


Our products operate safely on fluid transportation in over 20 countries around the world.

Delivery

Delivery4
Delivery3
Delivery2
Delivery1

FAQ

Can you accept small quantities?

Yes, accept small quantity, fast delivery

Do you have pre-shipment inspection procedures?

Yes, we always test the products before delivery.

Can I take samples for testing?

Yes, samples can be sent for testing before bulk ordering.

When is the delivery time?

Inventory orders within 7-15 days, for oem and odm orders, the specific time depends on the actual situation.

What are the terms of payment?

Wire transfer or letter of credit, Western Union, Alipay, etc.

What is the minimum order quantity?

It depends on the product.

Online inquiry


* Note: Please be sure to fill in the information accurately and keep the communication unblocked. We will contact you as soon as possible

Get a quote


*Please leave your phone number, we will contact you within 24 hours!